|
New Tech Solutions is a distributor of biomedical equipment that founded Ryan Telemedicine to manage the design
and manufacture of new products. In working with Ryan Telemedicine, we were able to save New Tech Solutions 65%
on the cost of goods sold, gain Ryan Telemedicine its first profit generator, and help the company owners fund new
development projects.
|
BSL Roles
Project Conception
Platform Architecture Design
Hardware Design
Component Engineering
Embedded Software Design
User Interface Design
Cost Optimization
Manufacturing Consulting
FDA Documentation
|
|
Accomplishments
65% Reduction in Cost of Goods Sold
Over $500,000 savings in six months
Project Payback within 3 months
Increased Profitability for New Tech Solutions
First Revenues and Profits for Ryan Telemedicine
Source of Funding for New Projects
|
About the Client
New Tech Solutions distributes biomedical equipment. Their products include the NTS1, a 2-channel interferential
electrotherapy device used to treat certain types of muscle and soft-tissue injuries. New Tech Solutions founded
Ryan Telemedicine to develop and manufacture future products.
Ryan Telemedicine asked Blue Sky Labs to bid on a new product development project for an advanced version of
the device, the NetWave Interferential Stimulator.
As part of the project bidding process, we evaluated the NTS1 for engineering, manufacturing, and
financial performance. The current product was manufactured and sold to New Tech by a third party at a cost
we felt was much higher than it needed to be. We proposed
that Ryan Telemedicine could begin by taking over the production of current product. Our design reduced the
cost of production by 65%.
The Project
Blue Sky Labs designed the NTS2 to be "substantially equivalent" to the older NTS1, allowing for fast and inexpensive
FDA approval. We also worked with our manufacturing partners to provide Ryan Telemedicine with turnkey electronics
manufacturing, keeping their production management expenses to a minimum. In the end, a combination of intelligent design,
manufacturing expertise, and efficient product sourcing saved our clients over $500,000 in 6 months.
|